The 2021 Surfside condo collapse led to sweeping changes in Florida condo law. These changes significantly impact buying decisions.
Milestone Inspections
Requirements
- Buildings 3+ stories: Inspection at 30 years (25 in coastal areas)
- Phase 1: Visual inspection of structural components
- Phase 2: Required if Phase 1 indicates issues
Timeline
- Existing buildings: Phased compliance through 2026
- New buildings: 30/25 year requirement from occupancy
Reserve Requirements
No More Reserve Waivers
Associations can no longer waive reserves for: - Roof - Structure - Load-bearing walls - Foundation - Electrical systems - Plumbing - Windows and doors
SIRS (Structural Integrity Reserve Study)
- Required for buildings 3+ stories
- Must be completed by December 31, 2024
- Updated every 10 years
Impact on Buyers
Due Diligence
Before buying a condo, request: - Milestone inspection reports - Reserve study - Reserve fund balance - Pending special assessments
Pricing Implications
- Well-maintained buildings command premiums
- Deferred maintenance buildings face pressure
- Special assessments can be substantial
Financing Challenges
Lenders are scrutinizing condos: - Fannie/Freddie requirements tightened - Some buildings becoming unfinanceable - Cash buyers gaining advantage


